skip to main
|
skip to sidebar
Caravan repairs
Tuesday, 8 September 2009
Side unit complete with curtains, light to be added at jobs end
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
statcounter
Followers
Blog Archive
►
2014
(1)
►
November
(1)
►
2010
(6)
►
December
(1)
►
August
(1)
►
June
(2)
►
April
(1)
►
March
(1)
▼
2009
(27)
►
November
(1)
▼
September
(26)
Light and roof rail sealing
http://www.nocounciltax.com/
Living in while repairing, Bin Laden did my van
Avondale Landranger 6400 damp repair
No title
All of the wood which is black was saturated with ...
All clamped to the outer skin with Pinkgrip again,...
These clamps were ideal in all window areas, no ne...
New wood in place and shored up, the smaller lengt...
The first two sections of new wood in place on the...
New wood glued and shored in place around the carv...
Angle bracket and light cluster surround from abov...
Easier than those woodworking joints and a stronge...
This is after my first cut attempt was too big to ...
New boarding going in place. The wood showing in t...
Angle grinder with Aldi sanding disk attached, rea...
More sanding required
Feathered in the wood filler with the angle grinde...
No title
I started at the back centre, working outwards to ...
No title
Side unit complete with curtains, light to be adde...
The rear has gone back in fine, only the bunk ligh...
Curtains were left fitted to the shelving units to...
No title
All done, everything back together and the only mo...
About Me
View my complete profile
No comments:
Post a Comment